Courtney Caile2026-01-09 15:17:312026-01-21 16:47:23Important Safety Update: End Of Balcony RestrictionsBuilding Safety Case
East Village Management Ltd (EVML) has not yet been asked to apply for a Building Assessment Certificate (BAC) by the Building Safety Regulator (BSR) so we have yet to submit an associated Building Safety Case Report.
This report will demonstrate how fire and structural safety risks are being managed. This document is under constant review from the Building Safety Regulator. The report summarises the steps the Principal Accountable Person (in this case, EVML) has taken to identify, assess, remove, reduce and manage building safety risks.
Means of Escape
Flats exit into protected corridors leading to a single staircase means of escape with final exits at ground floor direct to fresh air. Additional exit from the 1st floor into the central courtyard with an external fire escape to Logan Close. Secondary exits are available on the ground floor leading into covered car park.
AOV System
Automatic Opening Ventilation (AOV) system consists of a dedicated extract and inlet shaft located in the corridor. Both shafts terminate at roof level with an extract and inlet fan at its head. The inlet shaft is located adjacent to the stairs and the extract shaft is located at the far end of the corridor. A vent and damper are provided into each shaft from the corridor at each level.
Early Detection Alarms (EDAs)
We’re preparing to install an Early Detection Alarm (EDA) system into your building, which will replace the current waking watch patrol. The EDA is an extension to the existing fire alarm system and will provide a technology-based approach, detecting signs of fire earlier (e.g. heat rather than smoke) and means you’ll be alerted to a fire at the earliest possible opportunity.
The system we are planning to install will comprise of wireless heat detectors in each apartment and in communal areas, which all connect to a central hub.
Risks
External Walls
A full Fire Risk Appraisal of the External Walls (FRAEW) is available, and the summary for your building is below. If you’d like to see it in full or prefer a printed copy, please let us know. It highlights the following:
Balcony decking and soffits
The balcony decking and soffits (the underside of the balcony) are made from combustible materials. We’ve a full remediation plan in place and we’ll begin this work once the Building Safety Regulator (BSR) approves our designs. Your balcony is still safe to use, but please always follow fire safety rules (no smoking, barbecues, fire pits, lanterns, or fireworks on balconies).
Internal Work
Compartmentation (walls and lift shafts)
We’ve been assessing the internal walls, and the initial findings show the walls may not offer enough fire protection. This affects the corridors, lift shafts and some apartment walls. We’re well underway in planning the solution which will prevent smoke or fire spreading. Depending on the advice of our fire engineers, we’re planning to submit an application to the Building Safety Regulator (BSR), to approve the remediation plan. We’ll then appoint a contractor to complete this work.
Fire doors
Following a thorough investigation, we’ve found that most of the internal fire doors within your building do not meet fire safety standards. We’ll replace all affected doors and door frames as part of the internal work we’re carrying out. We’ll contact you in advance if your front door needs replacing.
Fire Risk Appraisal of External Walls (FRAEW)

Understanding the summary FRAEW:
PAS 9980 includes five risk level outcomes as summarised below:
- Low: The rate and extent of fire spread via the external wall construction is within normal expectation and risk is sufficiently low that no remediation is required.
- Medium (Tolerable): Risk is heightened but is nevertheless considered to be tolerable. There is potential to accept the heightened risk (subject to periodic review) provided any risk-proportionate actions are undertaken. In some cases no action is advised.
- Medium (Uncertain): Risk might be heightened, but it is not possible to determine that the risk is so high as to require risk reduction or sufficiently low that it can be tolerated.
- Medium (Upper): Risk is heightened to an extent beyond that which can be tolerated and risk reduction is required.
- High: Risk is significantly heightened, and risk reduction (remediation or mitigation) is required.